Describe the location:
TWP 144N-RGE 32W Section 9
Additional information about stand origin:
The Timber was harvested the summer of 2012. The site was broadcast sprayed with 2 quarts Forestry Garlon XRT in June 2013 and Disc trenched the fall of 2013. In April 2014 the site was planted with Red Pine at a rate of 760 seedlings/ac.
Brief silvicultural objective:
Even aged management of Red Pine. This treatment tested the effect on seedling growth of adding N to Velpar applied for competition control.
Soils:
867B Graycalm-Menahga Complex, characterized by somewhat excessively drained and excessively drained sandy loam soils from outwash or beach deposit parent material.